Skip to main content

Doint Project

The Doint Project has made considerable progress over the past week or two, reconstruction has passed the nervous phase and is steamrolling ahead. There's been a lot of screaming from the Gundead research sector, something about "THEY'RE IN OUR SKULLS!" or something. 

Comments

A week's favourite

Life Signs Lost on MJ38-C8

██/██/████ Enemal buildup has reached theoretical peak spread and density. Risk of infection and class-a breakout has been deemed dangerously high. Life signs have been lost on Subject MJ38-C8. Further testing has been suspended indefinitely due to testing failures and recent matters deemed "more pressing" Involved facilities are to utilize site-wide incinerators. Facility doors are to be locked. There is no evacuation procedure.